1
/
of
8
QILIPSU Outdoor Electrical Box, 11.4"x7.5"x5.5" Waterproof Junction Box IP67 ABS Plastic Enclosure Weatherproof Grey Hinged Cover for Electric Project Control
QILIPSU Outdoor Electrical Box, 11.4"x7.5"x5.5" Waterproof Junction Box IP67 ABS Plastic Enclosure Weatherproof Grey Hinged Cover for Electric Project Control
Regular price
$49.28 USD
Regular price
Sale price
$49.28 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
Share
